Project Description

Microsoft Turkey Headquarters Building

In the Microsoft Levent Headquarters Office, we have implemented every possible technology to ensure maximum comfort and energy efficiency. We have integrated FCU (Fan Coil Unit) units with wireless sensors operating with precision similar to the air handling unit. We have also conducted comprehensive energy measurements, including lighting and socket loads on each floor, as well as recording water consumption, even down to the water dispenser. Additionally, we have utilized the SkySpark system for advanced energy analytics and optimization.

  • Project Location: Levent, Istanbul/Turkey
  • Provided Service:
    Mechanical Automation System
    Chiller Plant Automation System
    SkySpark Energy Monitoring Reporting and Analysis System
    Socomec Modular UPS
    Socomec Next Generation Energy Analyzer
  • Project Start Date: 2019
  • Project Type: Office Buildings
  • Cooling Capacity: 1800 KW
  • Control Point Number: 1500
  • Integration Point Number: 4500