Project Description

Erasta Shopping Mall

The mechanical automation system of the first shopping mall project in Edirne, which houses 125 stores, was a project in which we took part in all processes including electrical panel manufacturing, project design, and implementation. We have established an automation system that effectively manages the heating and cooling needs of the stores through heat pumps, correctly manages the shared area load, and precisely controls the fan speed of air conditioning units that are designed as packages, ensuring maximum efficiency.

  • Project Location: Edirne, Turkey
  • Project Start Date: 2017
  • Provided Service: Mechanical Automation System
  • Project Type: Shopping Malls
  • Project Website: https://erastaedirne.com
  • Control Point Number: 2000
  • Integration Point Number: 2300

RELATED PROJECTS

RELATED PROJECTS